Peerless-av WBK100-W - Installation Manuel d'utilisateur Page 2

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 3
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 1
Visit the Peerless Web Site at www.peerlessmounts.com
2 of 3 ISSUED: 03-23-09 SHEET #:055-9262-1
B
A
Installation to Wood Stud Walls
Use a stud finder to locate the edges of the stud. Use of an edge-to-edge stud finder is highly recommended.
Based on its edges, draw a vertical line down the stud's center. Place wall plate (A) on wall as a template. Mark
the center of the four mounting holes. Drill four 5/32" (4 mm) dia. holes 2-1/2" (65 mm) deep. Secure wall plate
(A) to wood stud using four #14 x 2-1/2" wood screws (E) as shown. Skip to Step 3 of universal projector wall
arm.
Installer must verify that the supporting surface will safely support the combined load of the equipment and all
attached hardware and components.
Tighten wood screws so that wall plate is firmly attached, but do not overtighten. Overtightening can damage the
screws, greatly reducing their holding power.
Never tighten in excess of 80 in. • lb (9 N.M.).
Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud finder is
highly recommended.
Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs or joists.
Installers are responsible to provide hardware for other types of mounting situations.
WARNING
2
Vue de la page 1
1 2 3

Commentaires sur ces manuels

Pas de commentaire